Home | Oil & Gas
Oil & Gas
For the Oil & Gas sector Dieseko Group (including ICE BV) has a long track record of installing piles in the North Sea. Since the late 80’s our vibratory hammers have been operated on numerous projects and based on this experience we have designed, tested and produced new products to serve the highly demanding offshore Oil & Gas sector worldwide.
Over the last few years, handling time has become an increasingly important topic. Pile handling and easy operation of equipment has resulted in the design of our PVE MU (upending and lifting) series, and has been successfully deployed to cut costs on several projects.
- Initiation/ Start-up piles
- Jacket installation
- PLEM installation
- Conductor installation
- Anchor piles
- Pipe support piles
- Extraction of clogged followers
- De-commissioning
Client base: NAM / Van Oord / SHL / Saipem / Geosea / Boskalis / Micoperi / Allseas / WAV / Trevi etc.
Benefits of PVE vibro hammers:
- Significant time saving (handling tool)
- Noise reduction (< 140 dB)
- Less fatigue
- Cost efficient pile design
- Longer life-time of structures
- Accurate positioning
-
Option to extract piles
-
Multi-purpose hydraulic power packs which can drive also hydraulic impact hammers
and other equipment e.g. winches
- Trained offshore technicians/operators