Home | Oil & Gas | Oil & Gas Projects

PVE 52M installs foundation piles for PLEM, North Sea

Van Oord has awarded contract to Dieseko Group bv for supply of our PVE 52M vibratory hammer spread to install foundation piles for a PLEM. Due to design of the PLEM, Van Oord and Dieseko developed a tailor made clamping solution to avoid contact with the PLEM. Our PVE 52M worked very well and piles were installed within the projected time schedule.

52M active in the North Sea

ICE 1412C Making Waves Installing Large Diameter Casing on Oil Platform

Country China
Date March 2015
Description   Casing for sprinkler installation
Machines ICE 1412C & ICE 900 power pack
The number of offshore oil production platforms in China’s waters has seen significant growth over the last decades. Some operate in shallow depth others in deep water. As offshore platforms are isolated from the mainland and therefore out of reach of land-based rescue services they have self-supporting safety systems in place to safeguard their operation. A sprinkler system forms the backbone of a platforms fire safety system. Even though the platform is surrounded by water special care has to be given to the design and installation of the water pump that feeds the sprinkler system to ensure it is failsafe.


 

Read more

PVE 40VM deployed in Barrow in Furness.

Dong awarded CMP a contract to construct & install a complete berthing system for the crew transfer vessels in Barrow in Furness.
 
It included dredging, socketing piles into rock and construction of heavy concrete pontoons on site and the fabrication and installation of steel access platform and bridge.
 
The foundation was successfully accomplished with the PVE 40VM which was rented out by Watson & Hillhouse established in Ipswich UK.
Read the article on the offshoreWIND.biz website.  

Conductor pile installation NAM/Shell

Dieseko Group received an enquiry end of 2013 to engineer a solution to drive conductors on the North Sea. After several meetings and innovative solutions from both NAM, Swift Drilling and Dieseko Group, we offered a PVE52M vibratory hammer + 800PU hydraulic power pack. Tailor made modifications to adapt our hammer to client specific demands have been designed and executed and supplied our PVE vibratory hammer set on time to NAM. As Safety is KEY in Offshore Oil & Gas, and NAM is one of the leading companies world-wide, we are proud to have made the conductor installation a success and ended our common project end June 2014.


1412C extracts subsea structure anchors

In 2013 Dieseko Group bv received an enquiry from Reef Subsea to offer a rental unit to extract subsea structure anchors in the North Sea. After thorough investigation and discussions with Reef Subsea, it was concluded to supply an ICE 1412C hammer to extract the anchors at a depth of approximately 70 meters. Our complete offshore kit was supplied including technicians/operators to extract the anchors in minimum time frame. Tailor made modifications were designed and produced by Dieseko Group bv and due to supply of a complete solution the operation went very smoothly.